Infrastructure
  
    
  
  
    
      
    
    
    
      
      
      
      
      Electricity
      
      
      The property was connected to the public electricity in 2021. Accordingly, lines have been laid and power fuse boxes installed. Power lines and sockets have also been laid accordingly in the buildings.
      
    
      
    
      
      
      
      
      Water
      
      
      On the property there is a drilled deep well (78 meters).